Municipal Builders, Inc. has had the opportunity to work on many projects throughout the years the following are a few of the more notable ones.
              
                                                                                               Click for All Completed Projects

          Zimmerman, MN WWTF Improvements - Phase 1
        Engineer: Donahue & Associates
        Contract Price: $1,849,838          
        Date Completed: October 2010

 Photo Gallery  
  • New construction of two new Aerobic Digester tanks

  • Converted existing Aerobic Digester into a Sequencing Batch Reactor (SBR)

  • Replaced Aerobic Digester blowers

  • Existing plant needed to stay operational during construction

 

          Wayzata, MN WTP No. 3
        Engineer: Bonestroo
        Contract Price: $3,823,210          
        Date Completed: June 2010

 Photo Gallery  
  • New construction of 2.9  MGD water treatment plant

  • Two  1000 GPM gravity filters from Tonka Equipment Company

  • Demolition of existing water treatment plant

  • 500,000 gallon ground storage tank under the plant

  • Extremely small jobsite

 

__________________________________________________________________ 

          Isanti, MN WTP
        Engineer: Bolton & Menk
        Contract Price: $4,020,000            
        Date Completed: October 2009

 Photo Gallery  
  • New construction of 4.1  MGD water treatment plant

  • Four 712 gpm pressure filters from Siemens Technology

  • Backwash tank with adjustable head wash-down system

  • Chlorine system by Miox with two brine silos

  • 250 kw  on site generator

 

__________________________________________________________________ 

          Princeton, MN WTP No. 2
        Engineer: Short Elliott Hendrickson
        Contract Price: $3,095,300            
        Date Completed:
May 2008

 Photo Gallery  
  • New construction of 2 MGD water treatment plant

  • Twin 750 gpm pressure filters from Siemens Technology

  • Backwash tank with adjustable head wash-down system

  • Chemical feed systems

  • Public restroom with automated door locking system

 

__________________________________________________________________ 

 

         North Branch, MN WTP No. 2
        Engineer: WSB
        Contract Price: $6,600,500         
        Date Completed:
May 2009  

 Photo Gallery  
  • New 4 MGD water treatment  plant

  • 21,150 s/f precast tilt-up building with double tee roof

  • 1 million gallon water storage reservoir with architectural exterior finish and a domed, poured in place roof

  • Two backwash tanks with wash-down capabilities and floating suction strainer reclaim systems

  • Aluminum aeration vessel with poured concrete detention tank

  • Two 10' diameter by 52' long four cell pressure filters by Tonka Equipment

  • Office wing complete with chlorine, fluoride, polymer, ortho-phosphate, and potassium permanganate injection systems

  • 500 kw on site generator

 

__________________________________________________________________

 

        Blaine, MN WTP No. 1
        Engineer: Progressive Consulting Engineers
        Contract Price: $3,340,600          
        Date Completed:
November 2006 

 Photo Gallery  
  • New construction of a 2.9 MGD water treatment plant

  • Two reaction vessels and twin pressure filters were provided by Filtronics

  • Installation of a 60' air stripping tower to remove dangerous levels of groundwater contaminates

  • Extensive Landscaping

  • 400 Kw on site generator

__________________________________________________________________

          Blaine, MN WTP No. 2
        Engineer: Progressive Consulting Engineers
        Contract Price: $4,228,200         
        Date Completed: December 2005   

 Photo Gallery  
  • New construction of a 7.9 MGD water treatment plant

  • Two reaction vessels and four 1100 gpm pressure filters were provided by Filtronics

  • The project replaced an existing well house housing two wells and a third well was added under another contract.

  • 650 Kw on site generator

__________________________________________________________________

        Blaine, MN WTP No. 3
        Engineer: Progressive Consulting Engineers
        Contract Price: $2,806,600         
        Date Completed: October 2007    

 Photo Gallery  
  • New construction of a 2.9 MGD water treatment plant

  • Two reaction vessels and twin pressure filters from Filtronics

  • Gas chlorination system utilizing 1-ton chlorine cylinders

  • Air scrubber unit to be used in the event of a gas leak

__________________________________________________________________

        Blaine, MN Lift Stations
        Engineer: Pioneer Engineering
        Contract Price: Varying     

 Photo Gallery  

A total of five sewage lift stations for the city of Blaine varying from 10' x 10' square to 14' x 14' square inside dimension.  All were 50' deep and sunk utilizing a caisson method of construction.

Click Here to learn more about caisson construction

__________________________________________________________________

        Coon Rapids, MN East WTP
        Engineer: TKDA
        Contract Price: $2,142,400     
        Date Completed:
May 2006  

 Photo Gallery  
  • 3.5 MGD water plant expansion project

  • Two additional pressure filters were provided by Filtronics

  • Twin cast-in-place backwash tanks were added

  • Complete removal and replacement of roofing system

  • The chemical room was retrofitted with a new monorail system

  • New reclaim & sludge pumping system

__________________________________________________________________

        Coon Rapids, MN West WTP
        Engineer: TKDA
        Contract Price: $3,441,500   
        Date Completed:
August 2004  

 Photo Gallery  
  • A 4.3 MGD water plant expansion project

  • Two additional reaction vessels an twin pressure filters were provided by Filtronics

  • The project consisted of a sizeable building expansion including an addition to the pipe gallery below the floor

  • Complete removal and replacement of roofing system

  • The chemical room was retrofitted with a new monorail system

  • New reclaim & sludge pumping system

__________________________________________________________________

        Brooklyn Park, MN  WTP
        Engineer: Progressive Consulting Engineers
        Contract Price: $2,431,600  
        Date Completed:
May 2005 

 Photo Gallery  
  • Construction of a cast in place 3 million gallon reservoir

  • Reshaping of overflow ponds

  • Storm sewer relocation

__________________________________________________________________

        Becker, MN WWTP
        Engineer: Donahue & Associates with LHB
        Contract Price: $3,118,500  
        Date Completed: 
April 2004

 Photo Gallery  
  • Expansion of the existing wastewater treatment plant including lime stabilization equipment from RDP Technologies.

  • Soil correction including the reworking of the existing pond adjacent to the building

  • Lime storage tower

  • Aquastore sludge tank

  • An elaborate odor control system was also part of this project